Products Details
×
- Structure according to the structural mechanics and construction acts
- concrete block or ground screw piles as foundation
- Team of 4 professional labours can install 200KW in 1 day.
- The design has followed japan JIS standard and have obtained TUV and MCS certification.
- Steel are hot dipped galvanized with average galvanization thickness of 85, can stand up to the extreme weather conditions.
- Suitable for All Climates
U R Energy - All Rights Reserved