Ginni System Limited

 

  • Estimate raw material required for the production plan after considering on-hand stock
  • Push raw material to jobber based on BOM
  • Consume raw material based on receipts or decide manually
  • Receive alternative item from jobber
  • Debit jobber for wastage or receive excess material

 

 

 

Ginni System Limited All Rights Reserved.